Супервайзер по общестроительным работам
Описание
Asset Abuyev
Date of Birth 15.08.1981
Resident of Kazakhstan
Mob-8 701 342 21 26
abuev1981@mail.ru
Married
Aturay Engineer and Humanities Institute of Economics and Management
Education KAZKHSTAN university oil technology Metrology and Certification
My experience work with rotating equipment gas-turbine and electric Engine, pumps, compressors, repair, and commissioning
My experience work with Static
Read PI&D and calculate Isometric
Fabrication and installation PIPE-Spools on the pipe rack and in the module
As-per isometric
2022-2024 Novus Bolashak Senior technical mechanic
by Novus Bolashak, Tengiz, Atyrau, Kazakhstan as Mechanical-Commissioning Engineer (SMP) static-equipment (Section Pipeline)
Project: The future Growth Project / Wellhead Pressure Management Project (FGP/WPMP) is planned as the next major expansion of TCO's oil production capacity. The proposed expansion will feature three facilities: the 3rd generation Plant (3GP), Pressure Boost Facility (PBF) and the 3rd Generation Injection Plant (3GI).
Description:
The future Growth Project / Wellhead Pressure Management Project (FGP/WPMP) is included PBF separation units (03 trains) with capacity of 33420 m3/day, Gas compression units (04 trains) with capacity of 2519 MMSCFD, produced water units and all utilities units i.e., Steam, Fuel Gas, Flare (HP & LP), Air compressor, Nitrogen, closed drain & open drain
2019-2022 OPPB Foreman Area FACTORY (work with) NUMERICAL CONTROL PANEL (equipment)
2017-2019 Er-Sai FOREMAN WORK-SHOP NUMERICAL CONTROL PANEL use machine for manufacturing
Manufacturing Stel-Structural and pipe spools for TCO Project
2012-2017 Kaz- Turbo Factory foreman in disassembly and assembly of turbine units, including compressors pumps valves and electric motor
Responsibilities: control over the fulfillment of production targets in terms of the volume of production of products, the quality of the given nomenclature by the site within the established time frame, increasing labor productivity, reducing the labor intensity of products based on the rational loading of equipment and using its technical capabilities, economical use of materials energy
Commissioning of the Turbine model MAN
Gaz Project for West-Kazakhstan full COMPLETE REPAIR Turbine
Sicim 2012 Shut down Work with static equipment (Piping and Still Structural)
2011-2012 KCOI in Kashagan D-island Piping Foreman
2008-2011 Aker- Solution D-island Foreman Still-Structural
2006-2008 Bonnati millwright fitter work with Rotation equipment's Project TCO U-600
OIL-SULFUR FACULTY
2005-2006 PYNDJ LOID Pipe-Fitter Fabrication
21 января, 2017
Дмитрий
Город
Атырау
Возраст
37 лет (19 августа 1987)
2 августа, 2016
Радмир
Город
Атырау
Возраст
44 года (16 декабря 1980)
29 августа, 2016
Асем
Город
Атырау
Возраст
31 год ( 2 июня 1994)